Embedded Generation

3

Generation Connections

Interested in Distributed Energy Resources (DER) including solar panels, energy storage facilities, etc?  Complete a Preliminary Consultation Information Request (PCIR) – applicable for all generation connection sizes. We will review the PCIR  and establish classification and provide you the connection details of the proposed project and outline available capacity.  applicable steps.

Submit your project idea. Click on PCIR Form (below) to open downloadable form.  Atikokan Hydro Inc. Preliminary Consultation Information Request (PCIR) Form

 

 

Applicants are cautioned NOT to incur major expenses until Atikokan Hydro approves the proposed connection. Note, ESA approval is required prior to energization. 

Net Metering 10 kW or less

Net Metering is a program whereby eligible customers with specific generation facilities can reduce their net energy costs by exporting surplus generated energy back onto the utility distribution system for credit against the energy the customer consumes from the distribution system. Program Compliance with Ontario Regulation 541/05 – Net Metering  

Submit your project idea. Click on the Application (below) to open downloadable form.    Atikokan Hydro Net Metering Connection Application 

Connection Impact Assessment (CIA) Atikokan Hydro Fee Schedule

10 KW or less — All net metering projects with a generation nameplate of 10 kW or less (CIA not required for metering projects 10 kW or less) $0

Greater than 10 kW Fees apply

These fees are for CIA study only and exclude applicable construction costs, metering, etc.

Upstream transmitter CIA study fees may apply. See Hydro One fee schedule.  

 

Atikokan Hydro Capacity of Stations and Feeders

There is a limit to how much generation can be installed. This is for the integrity and reliabilty of the grid. Atikokan Hydro has both distributor and upstream transmitter capacity constraints for consideration with proposed generation projects.

StationFeederConstraints
(Y/N)
Capacity Constraint
HoganFeeder 1Yes Upstream Constraints
HawthorneFeeder 2Yes Upstream Constraints
HawthorneFeeder 3YesUpstream Constraints
MackenzieFeeder 4YesUpstream Constraints
MackenzieFeeder 5YesUpstream Constraints

Generator Classification Rating

Generator
Classification Rating
Micro≤ 10 kW
Small(a) ≤ 500 kW connected on distribution system voltage < 15 kV
(b) ≤ 1 MW connected on distribution system voltage ≥ 15 kV
Mid-Sized(a) ≤10 MW but > 500 kW connected on distribution system voltage < 15 kV
(b) > 1 MW but ≤ 10 MW connected on distribution system voltage ≥ 15 kV
Large> 10 MW